Alcatel Submarine Networks (ASN) (now acquired by Nokia Networks) is the world’s only fully integrated provider of turnkey submarine network solutions . Since 1850s, ASN has been producing repeaters, branching units and power feeding equipment at the site in Greewich, London. It was at this site that the world’s first transatlantic cable was manufactured in 1858. Today, the site houses modern production and clean room facilities as well as office space for project management and marine operations teams.
Atom Consultants was chartered to redesign the existing facilities dating back to inter- and post-war period to include new clean rooms, office spaces, and a new café and an entrance area. To help finance the investment, the surplus land at the site was sold to create a contemporary, high-quality community of new homes including a mixture of apartments and houses, called Telegraph Works.
The proposed scheme includes a refurbished factory and office space that will not only provide a more efficient, modern and attractive working environment for employees, but will also improve the character and visual appearance of the area.
The main contractor assigned for the works is Bluehammer who won the contract on the basis of a scheme design initially developed by Arup. Bluehammer appointed Atom Consultants to undertake the final design of the structural alterations which included the addition of significant additional floor areas for office and manufacturing facilities. The refurbishment also included long span Glulam timber frames forming the new remodelled entrance elevation and the reception atrium. Connections to the existing structural elements needed to be developed so that they could transmit the loading into the retained concrete frame whilst maintaining and aesthetic appearance required by the Architect and the Client.
The geotechnical survey identified a layer of soft alluvium overlying firm gravel deposits and therefore, the foundations to the building combined the existing building foundations with the addition of new piles to support the loading from the new floors and plant room areas. Atom Consultants evaluated the final loading on the piles which were designed by foundation specialist Roger Bullivant.
” Atom Consultants provided much valued assistance to our Project Management team throughout this major redevelopment of an established operational site. “
Jake Hanson
Project Manager
Arup
CURRENT PROJECTS:
OTHER PROJECTS
Imperial College London- Central Library Service Riser
Following the recent refurbishment of the library, a Service Riser weighing 25 tonnes was designed by Atom Consultants for the Imperial College London.
Wakefield Cathedral Spire Survey- Wakefield, West-Yorkshire
Wakefield Cathedral spire’s condition had not been surveyed for more than 50 years. We undertook a drone survey to get up close and personal with both the tiles on the spire as well as the resident peregrine falcons.
Modular SIPS for School Buildings
Originally developed for the BSF school building programme and now targeted towards the PF2 schools, a range of modular wall panel products have been developed and successfully implemented on a number of school projects with Balfour Beatty.
The Hold- Suffolk Archives Heritage Center, Ipswich
OUR WORK THE HOLD-SUFFOLK ARCHIVES HERITAGE CENTER, IPSWICH The Hold, which is one of the 21 key delivery projects of the ‘Ipswich Vision’, should open its doors in time for the 900th anniversary of the Record Office’s oldest document in 2019. Located on the...
citizenM Tower of London Hotel
Smart and efficient: citizenM Tower of London Hotel does not disappoint.
Vauxhall Underground Station- London
The Vauxhall Underground Station modernisation is part of Transport for London’s ongoing investment into London’s public transport network to support economic growth and employment opportunities.
The £36m project entailed reconfiguration of the station’s ticket hall to accommodate extra ticket gates and wide-aisle gates, as well as the refurbishment of the stations’ subways, ticket hall and stairs. The main part of the project was to make the access to the station step-free, enabling the station to handle 40% more passengers by installing a new shaft and lift between the ticket hall and platforms. A particular challenge was posed by the station remaining fully operational while the construction work took place between 2014 and 2016.
Winton Primary School Sports Hall- London
The London Borough of Islington had a requirement for a new sports hall to be used out-of-hours by the local community and it was to be built on the roof of and existing school- Winton Primary School.
To minimise disruption to this ‘live’ site, a modular approach was adopted. All components of the build were pre-fabricated, starting from the structural steel wall and roof panels and ending with the beautiful western red cedar clad external facade.
Providence Tower, Providence Wharf – London’s Docklands
Providence Tower stands at a breath-taking 43 storeys and is the jewel in the crown of the New Providence Wharf development – a stunning riverside community in London’s Docklands. These premier river-view apartments have far-reaching views over the River Thames, being one of the tallest residential towers in London, and a sky-bar atop the building gives residents the ultimate vantage point thanks to 360 degrees of uninterrupted glazing.
Sidi Krir 3 & 4 Power Plant, Alexandria, Egypt
Sidi Krir 3&4 power plant, a 685 MW natural gas-fired power complex, located 30 km west of Alexandria, is Egypt’s first BOOT (Build-Operate-Own-Transfer) power project and is one of the largest private power stations in the Middle East.