MODULAR SIPS  (Structural Insulated Panels) FOR SCHOOL BUILDINGS:


Originally developed for the BSF school building programme and now targeted towards the PF2 schools, a range of modular wall panel products have been developed and successfully implemented on a number of school projects with Balfour Beatty. The panelised system has been developed as part of the Balfour Beatty Modular system build approach to construction which facilitate rapid erection of the building envelope resulting in reduced construction times due to early availability of the internal work areas for the finished trades. Panels of up to 7.8m x 3.9m are lifted into position by cranes and secured to pre-engineered support brackets within a matter of minutes. Up to 28 large format panels are installed in a typical working day allowing the installation of the elevations a typical 6000sq.m academy size school to be delivered in a period of around 2 weeks. The elevation panels are developed in a detailed BIM model to exact dimensions for manufacturing. Accurate construction and installation then facilitated the installation of the windows to provide a weather tight enclosure in a very short timescale.

MODULAR CONSTRUCTION:

” The implementation of Off-Site manufacture for this school delivery programme was an essential part of our winning bid. Atom Consultants helped us develop this exceptional new delivery method for schools and provided our bid team with many highly detailed images which helped explain our proposals to the Clients team. “

Stevan Sutton
Finance Director
Balfour Beatty Scottish & Southern

Short description

OTHER PROJECTS

Pontefract Hospital, West Yorkshire

Pontefract Hospital, West Yorkshire

Pontefract Hospital, designed by Avanti Architects and built by Balfour Beatty is a model for a new type of community hospital that delivers a range of non-acute services for its local population. A two storey square courtyard building adjacent to the main entrance provides outpatient accommodation, while the taller L-shaped building provides the more heavily serviced and increasingly private zones.

read more
Pinderfields Hospital – Wakefield

Pinderfields Hospital – Wakefield

The redevelopment of Pinderfields Hospital has been central to the reconfiguration of health services in the Wakefield area. The new construction involved 90,000m² of acute hospital space on a footprint of 22,000m², all on a brown field site.

read more
Inverdee House, Aberdeen- Scottish Environment Protection Agency

Inverdee House, Aberdeen- Scottish Environment Protection Agency

Inverdee House is an extensive project commissioned by the Scottish Environment Protection Agency (SEPA). The building created a new office for SEPA and it’s laboratories and also for Scottish Natural Heritage and Joint Nature Conservation Committee. The intention in the design of this building was to reduce the impact on the environment through best practices of sustainable design and construction methods. The resulting building achieved a BREEAM excellent rating and an EPC A rating.

read more