OUR WORK
ASDA ECO STORES: SHAW & BOOTLE
ASDA (part of the Wal-Mart Stores Inc.) has long strived to become 100% energy efficient, hence they were the first in UK to build a sustainable timber -framed store, which is 20% more energy efficient than their traditional stores, as well as lowers the store’s carbon footprint by as much as 50 per cent.
We developed the designs for the prototype, which were to become a blueprint for all ASDA’s future eco-stores. The design was centered around the main principle -a large format timber frame utilising Glulan. The PEFC- sourced timber frame eradicates the need for 500 tonnes of steel, thereby saving 450 tonnes of carbon emissions, while also allowing “greater design flexibility” creating a low maintenance and highly insulated building.
Bricks from the old mill originally on the site were used to further lower material costs, use of natural light ingress was promoted and low level motorised louvres helped to aid cross-ventilation- all designed to make the store optimally energy efficient. The south facing roof captures light and heat from the sun and is made from 85% recyclable aluminium which has the added benefit of being
longer lasting than PVC.
The first store opened in Shaw, Oldham in 2007, followed by the £27 million, 40,000 sq ft store in Bootle, Merseyside in 2008, which on top of the expected bio-mass boiler and low-energy freezers (Mistral), also has higher levels of daylight than it’s traditional branches. The eco stores cost about £2 million more than a traditional ASDA store to build at the time, hence only a handful were constructed, but Atom designed elements of the eco-store have become the blueprints of all new ASDA stores across the UK.
RETAIL:
” Through the addition of a range of innovative energy efficiency measures to our plans, we expect that the completed Shaw store will now be 20% more energy efficient than when we first planned to build it. Through the construction of this store our aim is to create a template that will become the model and blueprint for all our future store developments. At ASDA we are fully committed to the targets we have set ourselves for improving the energy efficiency performance of our buildings. The development of the new store in Shaw is just the first step and there will be many new environmental initiatives introduced over the coming months and years that will help us achieve our goals “.
Bob Simpson
Head of Sustainable Store Development
at ASDA, UK
OTHER PROJECTS
Imperial College London- Central Library Service Riser
Following the recent refurbishment of the library, a Service Riser weighing 25 tonnes was designed by Atom Consultants for the Imperial College London.
Wakefield Cathedral Spire Survey- Wakefield, West-Yorkshire
Wakefield Cathedral spire’s condition had not been surveyed for more than 50 years. We undertook a drone survey to get up close and personal with both the tiles on the spire as well as the resident peregrine falcons.
Modular SIPS for School Buildings
Originally developed for the BSF school building programme and now targeted towards the PF2 schools, a range of modular wall panel products have been developed and successfully implemented on a number of school projects with Balfour Beatty.
Alcatel Submarine Networks- Greenwich, London
OUR WORK ALCATEL SUBMARINE NETWORKSGREENWICH, LONDON Alcatel Submarine Networks (ASN) (now acquired by Nokia Networks) is the world’s only fully integrated provider of turnkey submarine network solutions . Since 1850s, ASN has been producing repeaters,...
The Hold- Suffolk Archives Heritage Center, Ipswich
OUR WORK THE HOLD-SUFFOLK ARCHIVES HERITAGE CENTER, IPSWICH The Hold, which is one of the 21 key delivery projects of the ‘Ipswich Vision’, should open its doors in time for the 900th anniversary of the Record Office’s oldest document in 2019. Located on the...
citizenM Tower of London Hotel
Smart and efficient: citizenM Tower of London Hotel does not disappoint.
Vauxhall Underground Station- London
The Vauxhall Underground Station modernisation is part of Transport for London’s ongoing investment into London’s public transport network to support economic growth and employment opportunities.
The £36m project entailed reconfiguration of the station’s ticket hall to accommodate extra ticket gates and wide-aisle gates, as well as the refurbishment of the stations’ subways, ticket hall and stairs. The main part of the project was to make the access to the station step-free, enabling the station to handle 40% more passengers by installing a new shaft and lift between the ticket hall and platforms. A particular challenge was posed by the station remaining fully operational while the construction work took place between 2014 and 2016.
Winton Primary School Sports Hall- London
The London Borough of Islington had a requirement for a new sports hall to be used out-of-hours by the local community and it was to be built on the roof of and existing school- Winton Primary School.
To minimise disruption to this ‘live’ site, a modular approach was adopted. All components of the build were pre-fabricated, starting from the structural steel wall and roof panels and ending with the beautiful western red cedar clad external facade.
Providence Tower, Providence Wharf – London’s Docklands
Providence Tower stands at a breath-taking 43 storeys and is the jewel in the crown of the New Providence Wharf development – a stunning riverside community in London’s Docklands. These premier river-view apartments have far-reaching views over the River Thames, being one of the tallest residential towers in London, and a sky-bar atop the building gives residents the ultimate vantage point thanks to 360 degrees of uninterrupted glazing.