The Vauxhall Underground Station modernisation is part of Transport for London’s ongoing investment into London’s public transport network to support economic growth and employment opportunities.
The £45m project entailed reconfiguration of the station’s ticket hall to accommodate extra ticket gates and wide-aisle gates, as well as the refurbishment of the stations’ subways, ticket hall and stairs. The main part of the project was to make the access to the station step-free, enabling the station to handle 40% more passengers by installing a new shaft and lift between the ticket hall and platforms. A particular challenge was posed by the station remaining fully operational while the construction work took place between 2013 and 2017.
The main contractor selected was Bechtel, who proposed an innovative, new way of constructing the elevator shaft from below ground level, as well as utilising a sprayed concrete lining technique to save £9m from the total construction costs.
The principal requirement for the shaft was to accommodate the lift, which had to be constructed within the vertical concrete shaft and therefore required detailed co-ordination between all the existing structures, such as tunnels, ticket hall and the roof structure above.
Atom Consultants principal job was to create a BIM model of all the essential existing and new elements to enable total co-ordination to take place. We were also responsible for the structural design of all the structural elements providing support to the lift within the shaft and the escape stairs, which spiraled around the perimeter of the lift enclosure. As the construction proceeded, the access was available to make accurate measurements of the existing elements, and this information was fed back into BIM to adjust the model based on the actual survey conducted. As a result, the design was adjusted to fit within the actual building dimensions, whilst still maintaining the tight tolerances and necessary access space for lift maintenance engineers. Also, the entire model had to be co-ordinated with the London Grid, so that the facility could be incorporated into the London Underground Asset Register.
Additionally, all work had to be completed and independently reviewed in line with the precise standards to meet the stringent approval process for the London Underground.
Working in wonderful multi-disciplinary teams, which manage to collaborate efficiently is what made this project a particularly enjoyable one.
More info:
Bechtel’s case study on Vauxhall Underground Station, London, UK
TRANSPORTATION:
” The use of data is an inherent part of all Bechtel projects. Working collaboratively with Atom helped us deliver an innovate cost-effective solution for our customer and provide Londoners with their 70th step-free access tube station. “
MATT LAGAR
BECHTEL PROJECT MANAGER
OTHER PROJECTS
Blythswood Square Hotel – Glasgow
Blythswood Square (part of the PH Hotels) is an award winning, splendid 5-star spa hotel in Glasgow City Centre. Atom Consultants acted as Project Managers & Structural Engineers for the extensive refurbishment of this Grade B listed townhouse building.
Rhinefield House Hotel Brockenhurst, Hampshire
Rhinefield House Hotel is located deep within the New Forest National Park in Hampshire. Featuring an infamous Alhambra Room, inspired by the Moorish built Alhambra palace in Granada, Spain, this Hand Picked Hotel will embrace you with a warm welcome and keep your mind in zen mode during those long walks in their 40 acre grounds.
DOCKLANDS LIGHT RAILWAY STATIONS, LONDON: BECKTON CONTROL CENTRE, SHADWELL STATION & STRATFORD INTERNATIONAL CENTRE
Atom Consultants, at the forefront of latest technology, created an asset registry for interactive geospatial maps for several of the Docklands Light Railway (DLR) metro stations owned by Transport for London (TfL), such as the Stratford International Station and the Shadwell Station.
Abu Dhabi International Airport, UAE
The new Abu Dhabi International Airport’s Midfield Terminal Building in ADIA, UAE, built to accommodate up to 27 million passengers annually, is truly impressive in both design and build:
Great Yarmouth Power Station in South Denes
Great Yarmouth, in South Denes, is one of a new generation of highly efficient, gas–burning power stations, with the capacity to generate 400MW of electricity.The station was commissioned in 2002 and is one of the UK’s most modern stations, powered by natural gas using the latest generating technology – combined cycle gas turbines (CCGT).
C.A.S.P.A.R Apartments – Leeds
This Joseph Rowntree Foundation’s scheme in Leeds was set to prove that it is possible to develop an award-winning apartment block for the private-rented sector, then let it at below market rents and still make an attractive return on investment without any subsidy. The Leeds scheme was the second in a development blueprint programme called CASPAR – City-Centre Apartments for Single People at Affordable Rents.
Cleveland Clinic – Abu Dhabi, UAE
Cleveland Clinic Abu Dhabi, on Al Maryah Island, UAE, is a unique and unparalleled extension of US-based Cleveland Clinic’s model of care, specifically designed to address a range of complex and critical care requirements unique to the Abu Dhabi population. The facilities at Cleveland Clinic Abu Dhabi combine state-of-the-art amenities and world-class service standards.
Logoplaste
The Portugese privately owned rigid plastic packaging manufacturer Logoplaste’s product list includes bottles for the Lucozade and Jose Cuervo drinks brands, and for detergent Fairy liquid.
Cooke Aquaculture Scotland’s Salmon Production Facilities in Furnace
Atom Consultants project managed the extension of a salmon hatchery for Cooke Aquaculture Scotland Ltd., a salmon farming company located in Furnace, a village in Argyll, on the west coast of Scotland, on the north shore of Loch Fyne, the longest sea loch in the United Kingdom.