OUR WORK

INDUSTRIAL:

GREAT YARMOUTH POWER STATION: SOUTH DENES


Great Yarmouth, in South Denes,  is one of a new generation of highly efficient, gas–burning power stations, with the capacity to generate 400MW of electricity.The station was commissioned in 2002 and is one of the UK’s most modern stations, powered by natural gas using the latest generating technology – combined cycle gas turbines (CCGT).

We worked as structural engineers for Bechtel– named Top U.S. Contractor of 2016, providing all design drawings for the complete steel structure. Due to the client requirements, we had to work to American Institute of Steel Construction’s LRFD (Load &Resistance Factor Design) standards. We wrote our own design software to check the British Standard steel sections to the American Code.

JSW Severfield Structures Ltd. were the steel fabricators for the structure to whom we provided manufacturing steel drawings for all structural elements, including fixings, claddings, doors and louvres for the erection of 1,270 tonnes of structural steelwork.

Click here and here for our drone videos of the power station.

Quote

Your contribution on the project is very highly appreciated and you are showing high competence in you domain.

Wim van Roy, from Marine Harvest ASA

Short description

New slide

New Slide

New Slide

New Slide

OTHER PROJECTS

Nairn’s Oatcakes- Edinburgh
A previous brown-field site was developed into a brand new BRC Compliant gluten-free production facility for Nairn’s gluten-free biscuits and
Imperial College London- Central Library Service Riser
Following the recent refurbishment of the library, a Service Riser weighing 25 tonnes was designed by Atom Consultants for the
Bromley South Central St. Mark’s Square
The mixed-use Public Private Partnership scheme development includes a landscaped public plaza surrounded by a nine screen multiplex VUE cinema,
citizenM Tower of London Hotel
Smart and efficient: citizenM Tower of London Hotel does not disappoint.